Solar production-- WPV array
House consumption-- WLive demand
Battery power-- WWaiting
Outdoor light-- luxWaiting for sensor
Generator feed-- WStandby
-- WLine 1
-- WLine 2
-- WLine 3
GENERATOR
Run history
Observed runs above 100 W for the selected day. Times and duration are approximate; gaps over 2 minutes split runs. Partial runs touch a day boundary or missing readings. Battery charging includes all sources. Estimated generator charging allocates battery charge by the generator’s share of incoming power.
| Observed start – end | Duration | Generated | Average / peak output | Battery charged | Generator charging (est.) | Peak charging | Battery SOC |
|---|